18 January 2014
All Work Finished (For Now)
Our builder will be back later in the year (he is so recommended that he routinely has six months' work in hand) to construct some cupboards in the kitchen, the conservatory and the side passage), but in the meantime here's the completed staircase, with its hatch; and a couple of views of the attic, newly tidied now that we can get into it easily. The next step will be to have it internally spray-sealed, to reduce the degree of cold which penetrates from outside (there's no heat lost through the roof from inside, because the attic floor is doubly insulated) and incidentally guard against any possible moisture ingress (not there should be -- it's a roof, after all).
.JPG)
.JPG)
.JPG)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment